Log in to your RCTgo account

Please READ THIS BEFORE DOWNLOAD

Original post had been requested to delete.

[Update Details]
1) Minor change of path system to facilitate daily operation &
2) Petrol area of some handyman and mechanics is modified
3) Demolished Space Ring at park entrance.
4) Drinks and Hot Dog store are moved to one-way path moving towards inside of park to reduce intersection of main path connecting between the entrance and control tower.
5) Relocated first aid room facing straight on floorless coaster exit path. Distance between exit and first aid room is shortened to 2-grid long.

[NEW PROBLEM FOUND]
1) Mechanic 14 is placed out of petrol area and maintainace of rides inside that area are affected.
2) Petrol area gap is found for mechanic for exit path of monorails entrance stations. All ride exits are cover but missed one area of footpath leading to ride exit. It will be the problem if using openRCT2.

Fix it by yourself and I do not re-upload it anymore.


This park did not hit the objective deadline but it's completed.
It have a lot of spaces available to expand.
Except chairlift, all available rides were built.

See demo of closing-park arrangement to generate much entrance fee for last resource.

This works when guests cap is about to hit and most of guests had bought a lot of food/drinks or all souvenirs.
https://www.youtube.com/watch?v=dQw2it3vMCA

Park keeps well if nothing is done:
https://www.youtube.com/watch?v=ZoMKx4D9KGE&t=3557s

As park's being closed, guests could buy souvenirs or pee before they go. It boosts shop dales to alleviate the lost of fees due to closing park.

If you wish to complete objective without play this scenario. I hope you like it.

thumbs up if you like and wish to share with you the next difficult park - Rainbow Summit

Section Parks
File Size 2.13 MB
Date Uploaded Apr 20, 2019

Screenshots