Log in to your RCTgo account

The Condor Ride was something that I seldom tried because no matter what I did, the intensity went above 7. I had a lot of guests who have a preference range of 4-7. I always say that 7 is a sweet-spot for in any coaster.
After trying many different complex ones and burning cash in one particular campaign, I did this just out of exasperation. Imagine my surprise when the coaster had very respectable numbers for literally no efforts in design.
It only costs 2.7k to build and you can build another coaster within it to actually raise the excitement. This is one coaster I have had as a quick money spinner until I make enough to build in something more powerful. Although, with its figures it is worth holding on to

Section Tracks
Type Condor Ride
File Size 523 bytes
Date Uploaded Sep 30, 2020

Screenshots