Log in to your RCTgo account

My first creation. If you like it let me know.
E: 7.78
I: 9.20
N: 5.62

This coaster took me 4 hours to build, not because it was difficult but to get the timing right so that the coasters stay close to each other throughout the ride.

The coasters on this track take turns in the lead and end up finishing in a tie (with help of one block brake at the end).

Edit: Also the trains switch stations.

Peeps love it!

Section Tracks
Type Booster Bikes Ride
File Size 135.2 KB
Date Uploaded Feb 24, 2011

Screenshots

1 comment

Twin Coasters Inc.

I built the elevators as the only way to get to Mega Bikes and the peeps flock to it.